United States › Grid › Interconnection queues › Texas
ONSHORE WIND · SPPOnshore wind project GEN-2026-PR1, Ochiltree County
Onshore wind project GEN-2026-PR1, Ochiltree County is a 52.6 MW onshore wind request in interconnection study in the SPP interconnection queue, in Ochiltree County, Texas, connecting to OG&E.
Queue statusIn planning
- PlanningQueued Dec 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2026-PR1
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OG&E
- Connection point (POI)
- Beaver County 345 kV Substation
- Location
- Ochiltree County, Texas
- Technology
- Wind: 52.6 MW
- Total requested
- 52.6 MW
- Service type
- Energy only (ERIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 1 December 2025
- Proposed online date
- December 2030
Location
Marker shows the centre of Ochiltree County; the queue data does not give exact sites.
Other requests in Ochiltree County
- Solar project GEN-2017-040, Ochiltree CountySolar · 200 MW · agreement signed
- Onshore wind project GEN-2013-030, Ochiltree CountyOnshore wind · 300 MW · withdrawn
- Onshore wind project GEN-2023-123, Ochiltree CountyOnshore wind · 285 MW · withdrawn
- Onshore wind project GEN-2023-125, Ochiltree CountyOnshore wind · 250 MW · withdrawn
- Onshore wind project GEN-2017-044, Ochiltree CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project GEN-2017-045, Ochiltree CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project GEN-2017-046, Ochiltree CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project GEN-2023-124, Ochiltree CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project GEN-2015-006, Ochiltree CountyOnshore wind · 150 MW · withdrawn
- Onshore wind project GEN-2014-019, Ochiltree CountyOnshore wind · 15.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem