United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2017-044, Ochiltree County

Onshore wind project GEN-2017-044, Ochiltree County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Ochiltree County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedOct 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-044
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Canadian River-Muskogee and Muskogee-Seminole 345kV
Location
Ochiltree County, Texas
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 May 2017
Proposed online date
June 2020
Withdrawn
October 2018

Location

Marker shows the centre of Ochiltree County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ochiltree County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem