ONSHORE WIND Β· SPP

Onshore wind project GEN-2013-030, Ochiltree County

Onshore wind project GEN-2013-030, Ochiltree County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Ochiltree County, Texas, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2020 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2013-030
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV
Location
Ochiltree County, Texas
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Energy only (ERIS)
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
30 September 2013
Proposed online date
December 2020
Came online
December 2020

Location

Marker shows the centre of Ochiltree County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ochiltree County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem