πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2015-006, Ochiltree County

Onshore wind project GEN-2015-006, Ochiltree County is a 150 MW onshore wind request withdrawn in the SPP interconnection queue, in Ochiltree County, Texas, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2015 (completed)
  2. Withdrawn / abandonedSep 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-006
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Beaver County 345 kV
Location
Ochiltree County, Texas
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
23 March 2015
Proposed online date
December 2017
Withdrawn
September 2015

Location

Marker shows the centre of Ochiltree County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ochiltree County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem