United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Steppe Reserve Storage

Steppe Reserve Storage is a 51.9 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Dimmit County, Texas.

Queue statusIn planning
  1. PlanningQueued Jan 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jan 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
23INR0164
Grid region
ERCOT (Texas)
Developer
KCE TX 25, LLC
Connection point (POI)
8283 Asherton 138 kV
Location
Dimmit County, Texas
Technology
Battery: 51.9 MW
Total requested
51.9 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
25 January 2021
Proposed online date
January 2028

Location

Marker shows the centre of Dimmit County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Dimmit County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem