BATTERY STORAGE · ERCOTCarrizo Springs BESS
Carrizo Springs BESS is a 10.0 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Dimmit County, Texas.
Queue statusConsented
- PlanningQueued Aug 2024 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingDec 2025 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 25INR0592
- Grid region
- ERCOT (Texas)
- Developer
- Regis Carrizo Springs LLC
- Connection point (POI)
- Station Name: CARRIZO SPRINGS Station Code: CARIZZO Load/Load XFMR Name: LOAD1 PTI Bus Number: #8244 Voltage in kV (Transmission): 69 kV Distribution Voltage: 12.47 kV
- Location
- Dimmit County, Texas
- Technology
- Battery: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- MRD Approved
- Queue status
- Active
- Entered queue
- 22 August 2024
- Proposed online date
- December 2025
- Came online
- December 2025
Location
Marker shows the centre of Dimmit County; the queue data does not give exact sites.
Other requests in Dimmit County
- Onshore wind project GEN-2025-GR6, Dimmit CountyOnshore wind · 300 MW · in study
- Desert Palm BESSBattery storage · 201 MW · in study
- Wintergarden BESSBattery storage · 201 MW · in study
- Saluga Ranch StorageBattery storage · 125 MW · in study
- Wild Horse Desert SolarSolar + storage · 120 MW · in study
- Velado Storage SLFSolar + storage · 115 MW · in study
- Velado Solar SLFSolar + storage · 115 MW · in study
- Rose Quartz BESSBattery storage · 101 MW · in study
- Sugarloaf BESSBattery storage · 101 MW · in study
- Wild Horse Desert StorageSolar + storage · 90.3 MW · in study
- 7L Solar SLFSolar + storage · 71.6 MW · in study
- Steppe Reserve StorageBattery storage · 51.9 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem