United States › Grid › Interconnection queues › Texas
SOLAR + STORAGE · ERCOTHooper Solar
Hooper Solar is a 50.5 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Lee County, Texas.
Queue statusIn planning
- PlanningQueued Dec 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 24INR0473
- Grid region
- ERCOT (Texas)
- Developer
- BT Brown Solar, LLC
- Connection point (POI)
- Tap 138kV line between Lexington (Bus #7571) and Lyle Wolz (Bus #7567)
- Location
- Lee County, Texas
- Technology
- Solar: 50.5 MW · Battery
- Total requested
- 50.5 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 7 December 2022
- Proposed online date
- December 2027
Location
Marker shows the centre of Lee County; the queue data does not give exact sites.
Other requests in Lee County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem