🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

SOLAR + STORAGE · ERCOT

Hooper Solar

Hooper Solar is a 50.5 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Lee County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
24INR0473
Grid region
ERCOT (Texas)
Developer
BT Brown Solar, LLC
Connection point (POI)
Tap 138kV line between Lexington (Bus #7571) and Lyle Wolz (Bus #7567)
Location
Lee County, Texas
Technology
Solar: 50.5 MW · Battery
Total requested
50.5 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
7 December 2022
Proposed online date
December 2027

Location

Marker shows the centre of Lee County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Lee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem