SOLAR Β· ERCOT

Schoolhouse Solar

Schoolhouse Solar is a 151 MW solar request withdrawn in the ERCOT interconnection queue, in Lee County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2019 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. ConsentedJul 2021 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0211
Grid region
ERCOT (Texas)
Developer
Schoolhouse Solar, LLC
Connection point (POI)
tap 345kV 7040 Austrop - 13429 Sandow
Location
Lee County, Texas
Technology
Solar: 151 MW
Total requested
151 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
29 January 2019
Agreement signed
11 July 2021
Proposed online date
November 2025
Withdrawn
December 2024

Location

Marker shows the centre of Lee County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Lee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem