SOLAR Β· ERCOTSchoolhouse Solar
Schoolhouse Solar is a 151 MW solar request withdrawn in the ERCOT interconnection queue, in Lee County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2019 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- ConsentedJul 2021 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0211
- Grid region
- ERCOT (Texas)
- Developer
- Schoolhouse Solar, LLC
- Connection point (POI)
- tap 345kV 7040 Austrop - 13429 Sandow
- Location
- Lee County, Texas
- Technology
- Solar: 151 MW
- Total requested
- 151 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 29 January 2019
- Agreement signed
- 11 July 2021
- Proposed online date
- November 2025
- Withdrawn
- December 2024
Location
Marker shows the centre of Lee County; the queue data does not give exact sites.
Other requests in Lee County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem