SOLAR + STORAGE · ERCOT

Black Bear BESS

Black Bear BESS is a 51.2 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Crockett County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0366
Grid region
ERCOT (Texas)
Developer
ESCONDIDO DRAW RESOURCES, LLC
Connection point (POI)
#6564 ILLN4A 138kV
Location
Crockett County, Texas
Technology
Battery: 51.2 MW · Battery
Total requested
51.2 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
4 December 2023
Proposed online date
June 2028

Location

Marker shows the centre of Crockett County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Crockett County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem