United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 12
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| BRP Volga BESS Battery storage · BRP Volga BESS LLC |
175 MW | Withdrawn / abandoned |
| Sunshine Solar Solar · Sunshine Energy LLC |
173 MW | Withdrawn / abandoned |
| Cold Creek Storage Battery storage · Cold Creek Solar LLC |
172 MW | Withdrawn / abandoned |
| Salt Fork Wind Farm Ph 1 Onshore wind · Chermac Energy Corporation |
171 MW | Withdrawn / abandoned |
| Mason Mountain Wind 1 Onshore wind · Padoma Wind Power, LLC |
170 MW | Withdrawn / abandoned |
| Wren Storage Other · Wren Storage, LLC |
170 MW | Withdrawn / abandoned |
| Wren Solar Solar · Wren Solar, LLC |
170 MW | Withdrawn / abandoned |
| Flag City Storage SLF Battery storage · Flag City Solar Project, LLC |
169 MW | Withdrawn / abandoned |
| MegaCharge BESS Other · SMT Dallas II LLC |
169 MW | Withdrawn / abandoned |
| Flag City Solar Solar · Flag City Solar Project, LLC |
166 MW | Withdrawn / abandoned |
| Pampa Energy Center Coal · Pampa Energy Center, LLC |
165 MW | Withdrawn / abandoned |
| Bowhead Solar Solar · Baffin Bay Solar, LLC |
165 MW | Withdrawn / abandoned |
| Dusky Solar Solar · Cypress Creek Renewables |
165 MW | Withdrawn / abandoned |
| Carta Valley Wind Onshore wind · GE Energy |
165 MW | Withdrawn / abandoned |
| BRP Kotys BESS Battery storage · BRP Kotys BESS LLC |
163 MW | Withdrawn / abandoned |
| Glade Storage Battery storage · Glade Storage, LLC |
162 MW | Withdrawn / abandoned |
| South Loop Energy Center Battery storage · Concurrent Holdco LLC |
161 MW | Withdrawn / abandoned |
| Longhorn South Onshore wind · RES Americas |
161 MW | Withdrawn / abandoned |
| Elio Solar Solar · Elio Energy LLC |
161 MW | Withdrawn / abandoned |
| WIT Ranch Wind Onshore wind · Eon |
161 MW | Withdrawn / abandoned |
| Cachena Solar 2 SLF Solar · Clear Fork Creek Solar LLC |
160 MW | Withdrawn / abandoned |
| Solar Star Western Hills Storage Other · Solar Star Western Hills Storage, LLC |
160 MW | Withdrawn / abandoned |
| LHORN (Longhorn South W) Onshore wind · EDF Renewables |
160 MW | Withdrawn / abandoned |
| Freestone Chillers Gas · Calpine |
160 MW | Withdrawn / abandoned |
| Longhorn South Onshore wind · EDF Renewable Energy |
160 MW | Withdrawn / abandoned |
| Wilmeth Solar Solar · Wilmeth Solar, LLC |
160 MW | Withdrawn / abandoned |
| Rattlesnake W 2 Onshore wind · Invenergy |
158 MW | Withdrawn / abandoned |
| Live Oak Bayou Solar SLF Solar · FRESH AIR ENERGY II, LLC |
156 MW | Withdrawn / abandoned |
| BRP Zeya II BESS Other · BRP Zeya BESS LLC |
156 MW | Withdrawn / abandoned |
| Arana Creek Batt Battery storage · Arana Creek LLC |
154 MW | Withdrawn / abandoned |
| Grand Acres Solar · Fronton Solar 1 |
153 MW | Withdrawn / abandoned |
| Shawnee Bottom Solar Solar · Shawnee Bottom Solar, LLC |
153 MW | Withdrawn / abandoned |
| Hecate Grid Rosalita Storage Facility Other · HECATE GRID ROSALITA STORAGE LLC |
153 MW | Withdrawn / abandoned |
| Icarus Solar Solar · AP Solar 5, LLC |
153 MW | Withdrawn / abandoned |
| McGee Solar Solar · BT McGee Solar, LLC |
153 MW | Withdrawn / abandoned |
| Easter Wind B Onshore wind · TriGlobal |
153 MW | Withdrawn / abandoned |
| Cowboy Solar Solar · AP Solar Holdings LLC |
153 MW | Withdrawn / abandoned |
| Villarreal Solar SLF Solar · Orion US Land Holding Co LLC |
153 MW | Withdrawn / abandoned |
| Veco Ranch Solar SLF Solar · Orion US Land Holding Co LLC |
153 MW | Withdrawn / abandoned |
| Texana Solar Solar · Sunchase Power |
152 MW | Withdrawn / abandoned |
| High Chap Solar Solar · HIGH CHAPARRAL SOLAR PROJECT LLC |
152 MW | Withdrawn / abandoned |
| Young Wind II Onshore wind · Young Wind II |
152 MW | Withdrawn / abandoned |
| Matias Solar Solar · Industrial Bravo Project II LLC |
152 MW | Withdrawn / abandoned |
| Terranova Solar Solar · ABEI ENERGY&INFRASTRUCTURE LLC |
152 MW | Withdrawn / abandoned |
| Timberwolf POI A Solar Solar · CED Crane Solar 2, LLC |
152 MW | Withdrawn / abandoned |
| Toucan Solar Solar · ABEI ENERGY&INFRASTRUCTURE LLC |
152 MW | Withdrawn / abandoned |
| Gail Mountain Solar Solar · Gail Mountain Solar, LLC |
152 MW | Withdrawn / abandoned |
| Gail Mountain Storage Battery storage · Gail Mountain Solar, LLC |
152 MW | Withdrawn / abandoned |
| Blackwater Draw Solar Solar · Core Solar |
152 MW | Withdrawn / abandoned |
| Yellow Light Solar Solar · ABEI ENERGY & INFRASTRUCTURE LLC |
152 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)