United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

South Loop Energy Center

South Loop Energy Center is a 161 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0637
Grid region
ERCOT (Texas)
Developer
Concurrent Holdco LLC
Connection point (POI)
Tap 345 KV 5400 SPRUCE - 5231 HOWARD
Technology
Battery: 161 MW
Total requested
161 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
9 May 2024
Proposed online date
May 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem