United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Flag City Storage SLF

Flag City Storage SLF is a 169 MW battery storage request withdrawn in the ERCOT interconnection queue, in Jackson County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2021 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0414
Grid region
ERCOT (Texas)
Developer
Flag City Solar Project, LLC
Connection point (POI)
tap 138kV 5588 Red Bluff - 5546 Danevang
Location
Jackson County, Texas
Technology
Battery: 169 MW
Total requested
169 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
17 November 2021
Proposed online date
December 2027
Withdrawn
December 2025

Location

Marker shows the centre of Jackson County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Jackson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem