United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Flag City Solar

Flag City Solar is a 166 MW solar request withdrawn in the ERCOT interconnection queue, in Jackson County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0343
Grid region
ERCOT (Texas)
Developer
Flag City Solar Project, LLC
Connection point (POI)
tap 138kV 5588 Red Bluff - 5546 Danevang c1
Location
Jackson County, Texas
Technology
Solar: 166 MW
Total requested
166 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 May 2019
Proposed online date
December 2027
Withdrawn
December 2025

Location

Marker shows the centre of Jackson County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Jackson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem