United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTSunshine Solar
Sunshine Solar is a 173 MW solar request withdrawn in the ERCOT interconnection queue, in Victoria County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2019 (completed)
- Withdrawn / abandonedJan 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0259
- Grid region
- ERCOT (Texas)
- Developer
- Sunshine Energy LLC
- Connection point (POI)
- tap 138kV 8125 Lolita - 8172 Victoria
- Location
- Victoria County, Texas
- Technology
- Solar: 173 MW
- Total requested
- 173 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 13 February 2019
- Proposed online date
- July 2022
- Withdrawn
- January 2022
Location
Marker shows the centre of Victoria County; the queue data does not give exact sites.
Other requests in Victoria County
- Crossroads WindOnshore wind Β· 277 MW Β· agreement signed
- Leopard BESSBattery storage Β· 264 MW Β· agreement signed
- Oriana SolarSolar + storage Β· 181 MW Β· agreement signed
- Two Brothers ESSBattery storage Β· 152 MW Β· agreement signed
- Brizo BESSBattery storage Β· 141 MW Β· agreement signed
- Oriana BESSSolar + storage Β· 60.3 MW Β· agreement signed
- HyFuels Green Lake SolarSolar Β· 347 MW Β· in study
- HyFuels Calhoun SolarSolar Β· 302 MW Β· in study
- Marcos Solar SLFSolar + storage Β· 216 MW Β· in study
- Oak Belt StorageSolar + storage Β· 207 MW Β· in study
- Calico BESSBattery storage Β· 205 MW Β· in study
- Arpeggio BESSBattery storage Β· 201 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem