Timberwolf POI A Solar

Timberwolf POI A Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Upton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2018 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. ConsentedDec 2019 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0226
Grid region
ERCOT (Texas)
Developer
CED Crane Solar 2, LLC
Connection point (POI)
76635 King Mt 138kV
Location
Upton County, Texas
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
12 December 2018
Agreement signed
11 December 2019
Proposed online date
December 2022
Withdrawn
April 2021

Location

Marker shows the centre of Upton County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Upton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem