Toucan Solar

Toucan Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Reeves County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2019 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0245
Grid region
ERCOT (Texas)
Developer
ABEI ENERGY&INFRASTRUCTURE LLC
Connection point (POI)
38120 TNReeves 138kV
Location
Reeves County, Texas
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
28 January 2019
Proposed online date
January 2022
Withdrawn
June 2020

Location

Marker shows the centre of Reeves County; the queue data does not give exact sites.