BATTERY STORAGE Β· ERCOT

Gail Mountain Storage

Gail Mountain Storage is a 152 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0361
Grid region
ERCOT (Texas)
Developer
Gail Mountain Solar, LLC
Connection point (POI)
Tap 138 kV line 131953 Bull Creek Wind - 1301 Willow Valley
Technology
Battery: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 February 2024
Proposed online date
July 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem