πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Longhorn South

Longhorn South is a 160 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0058
Grid region
ERCOT (Texas)
Developer
EDF Renewable Energy
Connection point (POI)
140853 Tule Canyon 345kV
Technology
Wind: 160 MW
Total requested
160 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
6 March 2012
Agreement signed
10 December 2012
Proposed online date
December 2020

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem