United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

WIT Ranch Wind

WIT Ranch Wind is a 161 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2017 (completed)
  2. Withdrawn / abandonedNov 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0108
Grid region
ERCOT (Texas)
Developer
Eon
Connection point (POI)
6050 Lake Pauline 138kV
Technology
Wind: 161 MW
Total requested
161 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
9 August 2017
Proposed online date
December 2019
Withdrawn
November 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem