ONSHORE WIND Β· ERCOTRattlesnake W 2
Rattlesnake W 2 is a 158 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedJun 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 13INR0020b
- Grid region
- ERCOT (Texas)
- Developer
- Invenergy
- Connection point (POI)
- 132213 Bearkat 345kV
- Technology
- Wind: 158 MW
- Total requested
- 158 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 10 December 2009
- Agreement signed
- 28 June 2013
- Proposed online date
- May 2020
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem