Elio Solar is a 161 MW solar request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2022 (completed)
  2. Withdrawn / abandonedJan 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0104
Grid region
ERCOT (Texas)
Developer
Elio Energy LLC
Connection point (POI)
Tap 138kV 42980 Nash - 44010 Wa Parish CKt 02
Location
Brazoria County, Texas
Technology
Solar: 161 MW
Total requested
161 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
4 August 2022
Proposed online date
July 2025
Withdrawn
January 2024

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.