United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBlackwater Draw Solar
Blackwater Draw Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Dawson County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2017 (completed)
- Withdrawn / abandonedNov 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 19INR0115
- Grid region
- ERCOT (Texas)
- Developer
- Core Solar
- Connection point (POI)
- tap 138kV 1170 Paul Davis tap - 18880 Jim Payne
- Location
- Dawson County, Texas
- Technology
- Solar: 152 MW
- Total requested
- 152 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 27 July 2017
- Proposed online date
- December 2021
- Withdrawn
- November 2020
Location
Marker shows the centre of Dawson County; the queue data does not give exact sites.
Other requests in Dawson County
- Longview WindOnshore wind Β· 353 MW Β· agreement signed
- Red Holly SolarSolar + storage Β· 260 MW Β· agreement signed
- Red Holly StorageSolar + storage Β· 50.0 MW Β· agreement signed
- Red Holly Storage 1Solar + storage Β· 50.0 MW Β· agreement signed
- Fivemile WindOnshore wind Β· 282 MW Β· in study
- Mesquite Creek Windpower RepowerOnshore wind Β· 213 MW Β· in study
- Green Holly SolarSolar Β· 414 MW Β· suspended
- Al Pastor BESSOther Β· 103 MW Β· built
- Lamesa Solar B (Phase II) IVORYSolar Β· 50.0 MW Β· built
- Gold Creek SolarSolar Β· 140 MW Β· withdrawn
- Atascosa I SolarSolar Β· 127 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem