πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Blackwater Draw Solar

Blackwater Draw Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Dawson County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2017 (completed)
  2. Withdrawn / abandonedNov 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0115
Grid region
ERCOT (Texas)
Developer
Core Solar
Connection point (POI)
tap 138kV 1170 Paul Davis tap - 18880 Jim Payne
Location
Dawson County, Texas
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
27 July 2017
Proposed online date
December 2021
Withdrawn
November 2020

Location

Marker shows the centre of Dawson County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Dawson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem