United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTWren Storage
Wren Storage is a 170 MW other request withdrawn in the ERCOT interconnection queue, in Willacy County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2021 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0177
- Grid region
- ERCOT (Texas)
- Developer
- Wren Storage, LLC
- Connection point (POI)
- 8601 Cebolla 345kV
- Location
- Willacy County, Texas
- Technology
- Other: 170 MW
- Total requested
- 170 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 24 January 2021
- Proposed online date
- October 2024
- Withdrawn
- March 2024
Location
Marker shows the centre of Willacy County; the queue data does not give exact sites.
Other requests in Willacy County
- El Sauz RanchOnshore wind Β· 302 MW Β· agreement signed
- Monte Alto 2 WindOnshore wind Β· 200 MW Β· agreement signed
- Monte Alto IOnshore wind Β· 142 MW Β· agreement signed
- Los Vientos IB RepowerOnshore wind Β· 185 MW Β· in study
- San Perlita BESS 1Battery storage Β· 150 MW Β· in study
- San Perlita BESS 2Battery storage Β· 150 MW Β· in study
- Lyford EnergyBattery storage Β· 101 MW Β· in study
- Las Majadas WindOnshore wind Β· 273 MW Β· built
- West Raymond (Trueno) WindOnshore wind Β· 240 MW Β· built
- East Raymond Wind (El Rayo)Onshore wind Β· 202 MW Β· built
- Wren SolarSolar Β· 170 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem