United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTLyford Energy
Lyford Energy is a 101 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Willacy County, Texas.
Queue statusIn planning
- PlanningQueued Mar 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 24INR0534
- Grid region
- ERCOT (Texas)
- Developer
- Lyford Energy, LLC
- Connection point (POI)
- 5745 E Raymondville 138kV
- Location
- Willacy County, Texas
- Technology
- Battery: 101 MW
- Total requested
- 101 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 8 March 2023
- Proposed online date
- September 2027
Location
Marker shows the centre of Willacy County; the queue data does not give exact sites.
Other requests in Willacy County
- El Sauz RanchOnshore wind · 302 MW · agreement signed
- Monte Alto 2 WindOnshore wind · 200 MW · agreement signed
- Monte Alto IOnshore wind · 142 MW · agreement signed
- Los Vientos IB RepowerOnshore wind · 185 MW · in study
- San Perlita BESS 1Battery storage · 150 MW · in study
- San Perlita BESS 2Battery storage · 150 MW · in study
- Las Majadas WindOnshore wind · 273 MW · built
- West Raymond (Trueno) WindOnshore wind · 240 MW · built
- East Raymond Wind (El Rayo)Onshore wind · 202 MW · built
- Wren StorageOther · 170 MW · withdrawn
- Wren SolarSolar · 170 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem