πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Wren Solar

Wren Solar is a 170 MW solar request withdrawn in the ERCOT interconnection queue, in Willacy County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandonedMar 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0440
Grid region
ERCOT (Texas)
Developer
Wren Solar, LLC
Connection point (POI)
8601 Cebolla 345kV
Location
Willacy County, Texas
Technology
Solar: 170 MW
Total requested
170 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 October 2019
Proposed online date
October 2024
Withdrawn
March 2024

Location

Marker shows the centre of Willacy County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Willacy County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem