United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTVeco Ranch Solar SLF
Veco Ranch Solar SLF is a 153 MW solar request withdrawn in the ERCOT interconnection queue, in Webb County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2024 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 29INR0045
- Grid region
- ERCOT (Texas)
- Developer
- Orion US Land Holding Co LLC
- Connection point (POI)
- 8283 ASHERTON4A 138kV_x000D_
- Location
- Webb County, Texas
- Technology
- Solar: 153 MW
- Total requested
- 153 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 29 July 2024
- Proposed online date
- August 2029
- Withdrawn
- April 2025
Location
Marker shows the centre of Webb County; the queue data does not give exact sites.
Other requests in Webb County
- SieteOnshore wind Β· 493 MW Β· agreement signed
- Cuchillas SolarSolar + storage Β· 306 MW Β· agreement signed
- Corazon Solar Phase IISolar + storage Β· 204 MW Β· agreement signed
- Corvus SolarSolar Β· 202 MW Β· agreement signed
- Seven Flags BESSBattery storage Β· 103 MW Β· agreement signed
- Cedro Hill Wind RepowerOnshore wind Β· 9.9 MW Β· agreement signed
- Torrecillas BESSBattery storage Β· 9.9 MW Β· agreement signed
- Outpost StorageSolar + storage Β· 508 MW Β· in study
- Siete WindOnshore wind Β· 493 MW Β· in study
- Cuchillas BESSSolar + storage Β· 307 MW Β· in study
- Cenizo SolarSolar Β· 301 MW Β· in study
- Bendito WindOnshore wind Β· 300 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem