πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Glade Storage

Glade Storage is a 162 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
29INR0087
Grid region
ERCOT (Texas)
Developer
Glade Storage, LLC
Connection point (POI)
Tap 138kV (3170) Emory POD- (3171) Emory North
Technology
Battery: 162 MW
Total requested
162 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 February 2025
Proposed online date
January 2029

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem