United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Terranova Solar

Terranova Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Knox County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedJan 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0271
Grid region
ERCOT (Texas)
Developer
ABEI ENERGY&INFRASTRUCTURE LLC
Connection point (POI)
60506 Avogadro 345kV
Location
Knox County, Texas
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
31 March 2019
Proposed online date
March 2024
Withdrawn
January 2024

Location

Marker shows the centre of Knox County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Knox County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem