United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTTerranova Solar
Terranova Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Knox County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedJan 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0271
- Grid region
- ERCOT (Texas)
- Developer
- ABEI ENERGY&INFRASTRUCTURE LLC
- Connection point (POI)
- 60506 Avogadro 345kV
- Location
- Knox County, Texas
- Technology
- Solar: 152 MW
- Total requested
- 152 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 31 March 2019
- Proposed online date
- March 2024
- Withdrawn
- January 2024
Location
Marker shows the centre of Knox County; the queue data does not give exact sites.
Other requests in Knox County
- Zeissel SolarSolar Β· 452 MW Β· agreement signed
- West Munday WindOnshore wind Β· 352 MW Β· agreement signed
- Oriole SolarSolar + storage Β· 504 MW Β· in study
- Sundance SolarSolar Β· 301 MW Β· in study
- Wagon Timber SolarSolar + storage Β· 172 MW Β· in study
- Oriole BESSolar + storage Β· 150 MW Β· in study
- Lemma SolarSolar Β· 101 MW Β· in study
- Knox County Moore StorageBattery storage Β· 77.0 MW Β· in study
- Wagon Timber StorageSolar + storage Β· 53.5 MW Β· in study
- TG East WindOnshore wind Β· 336 MW Β· built
- Griffin Trail WindOnshore wind Β· 226 MW Β· built
- Vera WindOnshore wind Β· 209 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem