United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTGriffin Trail Wind
Griffin Trail Wind is a 226 MW onshore wind request built and operating in the ERCOT interconnection queue, in Knox County, Texas.
Request details
- Queue ID
- 20INR0052
- Grid region
- ERCOT (Texas)
- Developer
- Innergex
- Connection point (POI)
- 60506 AVOGADRO 345 kV
- Location
- Knox County, Texas
- Technology
- Wind: 226 MW
- Total requested
- 226 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 4 March 2018
- Agreement signed
- 4 March 2019
- Proposed online date
- October 2021
- Came online
- October 2021
Location
Marker shows the centre of Knox County; the queue data does not give exact sites.
Other requests in Knox County
- Zeissel SolarSolar · 452 MW · agreement signed
- West Munday WindOnshore wind · 352 MW · agreement signed
- Oriole SolarSolar + storage · 504 MW · in study
- Sundance SolarSolar · 301 MW · in study
- Wagon Timber SolarSolar + storage · 172 MW · in study
- Oriole BESSolar + storage · 150 MW · in study
- Lemma SolarSolar · 101 MW · in study
- Knox County Moore StorageBattery storage · 77.0 MW · in study
- Wagon Timber StorageSolar + storage · 53.5 MW · in study
- TG East WindOnshore wind · 336 MW · built
- Vera WindOnshore wind · 209 MW · built
- Vera Wind V110Onshore wind · 34.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem