United States › Grid › Interconnection queues › Texas

ONSHORE WIND · ERCOT

Vera Wind V110

Vera Wind V110 is a 34.0 MW onshore wind request built and operating in the ERCOT interconnection queue, in Knox County, Texas.

Queue statusOperating
  1. PlanningQueued Mar 2020 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 2021 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
20INR0305
Grid region
ERCOT (Texas)
Developer
Longroad Energy
Connection point (POI)
tap 345kV 60500 EdithC - 60700 Gauss (proposed Coloumb substation for 19INR0051)_x000D_
Location
Knox County, Texas
Technology
Wind: 34.0 MW
Total requested
34.0 MW
Study phase
IA
Queue status
Operational
Entered queue
18 March 2020
Proposed online date
April 2021
Came online
May 2021

Location

Marker shows the centre of Knox County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Knox County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem