ONSHORE WIND Β· ERCOTTG East Wind
TG East Wind is a 336 MW onshore wind request built and operating in the ERCOT interconnection queue, in Knox County, Texas.
Request details
- Queue ID
- 19INR0052
- Grid region
- ERCOT (Texas)
- Developer
- Northrenew
- Connection point (POI)
- 60722 Coulomb 345kV
- Location
- Knox County, Texas
- Technology
- Wind: 336 MW
- Total requested
- 336 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 3 April 2017
- Agreement signed
- 22 October 2018
- Proposed online date
- December 2022
- Came online
- December 2022
Location
Marker shows the centre of Knox County; the queue data does not give exact sites.
Other requests in Knox County
- Zeissel SolarSolar Β· 452 MW Β· agreement signed
- West Munday WindOnshore wind Β· 352 MW Β· agreement signed
- Oriole SolarSolar + storage Β· 504 MW Β· in study
- Sundance SolarSolar Β· 301 MW Β· in study
- Wagon Timber SolarSolar + storage Β· 172 MW Β· in study
- Oriole BESSolar + storage Β· 150 MW Β· in study
- Lemma SolarSolar Β· 101 MW Β· in study
- Knox County Moore StorageBattery storage Β· 77.0 MW Β· in study
- Wagon Timber StorageSolar + storage Β· 53.5 MW Β· in study
- Griffin Trail WindOnshore wind Β· 226 MW Β· built
- Vera WindOnshore wind Β· 209 MW Β· built
- Vera Wind V110Onshore wind Β· 34.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem