United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Gail Mountain Solar

Gail Mountain Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0360
Grid region
ERCOT (Texas)
Developer
Gail Mountain Solar, LLC
Connection point (POI)
Tap 138 kV line #131955 Bull Creek Wind - #1301 Willow Valley
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
3 January 2024
Proposed online date
July 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem