United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTGail Mountain Solar
Gail Mountain Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 26INR0360
- Grid region
- ERCOT (Texas)
- Developer
- Gail Mountain Solar, LLC
- Connection point (POI)
- Tap 138 kV line #131955 Bull Creek Wind - #1301 Willow Valley
- Technology
- Solar: 152 MW
- Total requested
- 152 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 3 January 2024
- Proposed online date
- July 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem