United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 23
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| SHOAL POINT Steam Turbine Other · Fortescue |
28.4 MW | Withdrawn / abandoned |
| Sol Sienta Solar Solar · Sol Sienta Solar, LLC |
28.4 MW | Withdrawn / abandoned |
| Markum Solar 2 Solar · Glory Leasing |
26.1 MW | Withdrawn / abandoned |
| Brushy Creek Storage Other · Brushy Creek Solar LLC |
25.1 MW | Withdrawn / abandoned |
| Timberwolf BESS Other · Crane BESS, LLC |
25.0 MW | Withdrawn / abandoned |
| Comanche South Solar Solar · Lendlease Energy |
25.0 MW | Withdrawn / abandoned |
| SP TX-12B Phase II Solar |
25.0 MW | Withdrawn / abandoned |
| Pecos Solarpower II Solar · Duke Energy Renewables Solar, LLC |
25.0 MW | Withdrawn / abandoned |
| T2 EF Cogen (Silver Oak Processing) Gas · T2 EF Cogeneration, LLC |
25.0 MW | Withdrawn / abandoned |
| Barclay BrEl PV Solar · SoCore Energy |
25.0 MW | Withdrawn / abandoned |
| Comanche Ridge Wind Onshore wind · Baryonyx |
24.0 MW | Withdrawn / abandoned |
| Hovey Energy Storage Battery storage · Barilla Solar, LLC |
23.0 MW | Withdrawn / abandoned |
| Delek Big Spring Solar Solar · TotalEnergies Distributed Generation USA, LLC |
21.4 MW | Withdrawn / abandoned |
| Barilla Solar 2 Solar · First Solar |
21.0 MW | Withdrawn / abandoned |
| Haskell Knox Wind Farm Onshore wind · Duke Energy Generation Services |
21.0 MW | Withdrawn / abandoned |
| ARCHER Solar 2 Solar · Leeward Renewable Energy Development, LLC |
20.4 MW | Withdrawn / abandoned |
| Zier Storage Phase 2 Other · Zier Solar, LLC |
20.2 MW | Withdrawn / abandoned |
| Fence Post BESS MW Increase Other · Fence Post Solar Project, LLC |
20.2 MW | Withdrawn / abandoned |
| RE Trent Solar · Recurrent Energy |
20.0 MW | Withdrawn / abandoned |
| AES Parkdale Storage Battery storage · AES |
20.0 MW | Withdrawn / abandoned |
| Garnet Solar Solar · Innovative Solar |
20.0 MW | Withdrawn / abandoned |
| Panther Creek S 2 Solar · Eon |
20.0 MW | Withdrawn / abandoned |
| EK Tipton Solar 1 Solar · EnergieKontor US Texas SP 1 LLC |
20.0 MW | Withdrawn / abandoned |
| Hays Solar Solar · Hays Solar |
20.0 MW | Withdrawn / abandoned |
| Baird North II Wind Onshore wind · BMP Wind LLC |
20.0 MW | Withdrawn / abandoned |
| Daltus DG Gas · Duke Energy One, Inc. |
19.5 MW | Withdrawn / abandoned |
| Shannon-1 Wind Farm Phase 2 Onshore wind · Shannon-1 Wind Farm, LLC |
19.2 MW | Withdrawn / abandoned |
| John Paul Jones Gas · Dflex Power |
18.6 MW | Withdrawn / abandoned |
| Reiher Solar II Solar · EnergieKontor US Texas SP 7 LLC |
18.4 MW | Withdrawn / abandoned |
| Gulf Offshore Wind 1 Offshore wind · Baronyx |
18.0 MW | Withdrawn / abandoned |
| Cross Trails Gravitational Storage Other · Cross Trails Energy Storage Project, LLC |
18.0 MW | Withdrawn / abandoned |
| Snyder BESS Other · Snyder Wind Farm, LLC |
17.6 MW | Withdrawn / abandoned |
| Sherbino II BESS SLF (Placeholder) Other · Phoenix Battery Storage, LLC |
17.0 MW | Withdrawn / abandoned |
| Delek Big Spring Storage Battery storage · TotalEnergies Distributed Generation USA, LLC |
15.3 MW | Withdrawn / abandoned |
| Bluebell 3 Solar · Bluebell Solar |
15.0 MW | Withdrawn / abandoned |
| McAdoo repower Onshore wind |
14.7 MW | Withdrawn / abandoned |
| PP Jaguar BESS Other · SP-Jaguar Solar LLC |
14.3 MW | Withdrawn / abandoned |
| Vortex Wind II Onshore wind |
14.0 MW | Withdrawn / abandoned |
| Nightfall BESS SLF Battery storage · BDPU Solar Nightfall, LLC |
11.0 MW | Withdrawn / abandoned |
| Hornet Solar 2 LLC Cancelled Solar · Hornet Solar LLC |
11.0 MW | Withdrawn / abandoned |
| TG East 2 Onshore wind · TG East Wind Project LLC |
10.0 MW | Withdrawn / abandoned |
| Albatross FIS application fee Other · Albatross Solar, LLC |
10.0 MW | Withdrawn / abandoned |
| Wieland Substation BESS Unit 1 Battery storage · Telios Quinlan Energy One, LLC |
9.9 MW | Withdrawn / abandoned |
| Moore Field BESS Battery storage · SBESS TX11 LLC |
9.9 MW | Withdrawn / abandoned |
| Pueblo BESS Battery storage · SBESS TX 9 LLC |
9.9 MW | Withdrawn / abandoned |
| North McAllen BESS Battery storage · SBESS TX 3, LLC |
9.9 MW | Withdrawn / abandoned |
| Jourdanton BESS Battery storage · Jourdanton BESS LLC |
9.8 MW | Withdrawn / abandoned |
| Sand Bluff Repower Onshore wind |
8.0 MW | Withdrawn / abandoned |
| E Babe Smith Solar Solar · Hwy 183 Solar LLC |
7.6 MW | Withdrawn / abandoned |
| HOVEY (Barilla Solar 1B) Solar · First Solar |
7.4 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)