United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTSol Sienta Solar
Sol Sienta Solar is a 28.4 MW solar request withdrawn in the ERCOT interconnection queue, in Ward County, Texas.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedAug 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 28INR0136
- Grid region
- ERCOT (Texas)
- Developer
- Sol Sienta Solar, LLC
- Connection point (POI)
- Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub
- Location
- Ward County, Texas
- Technology
- Solar: 28.4 MW
- Total requested
- 28.4 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Proposed online date
- June 2028
- Withdrawn
- August 2024
Location
Marker shows the centre of Ward County; the queue data does not give exact sites.
Other requests in Ward County
- BasRanch (TEF - Due Diligence)Gas Β· 1,350 MW Β· agreement signed
- Vast Sands Power II (TEF-Due Diligence)Gas Β· 440 MW Β· agreement signed
- Vast Sands Power I (TEF -Due Diligence)Gas Β· 440 MW Β· agreement signed
- Staghorn GasGas Β· 10.0 MW Β· agreement signed
- Pyote GasGas Β· 9.9 MW Β· agreement signed
- Cedarvale GasGas Β· 9.9 MW Β· agreement signed
- New Minglewood Energy CenterBattery storage Β· 208 MW Β· in study
- BRP Rhine BESSBattery storage Β· 207 MW Β· in study
- BRP Pyxis BESSBattery storage Β· 207 MW Β· in study
- Frizzle BESSBattery storage Β· 181 MW Β· in study
- Proteus Thornton Ranch Solar SLFSolar + storage Β· 180 MW Β· in study
- Shallow Valley StorageBattery storage Β· 103 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem