United States › Grid › Interconnection queues › Texas
GAS · ERCOTVast Sands Power I (TEF -Due Diligence)
Vast Sands Power I (TEF -Due Diligence) is a 440 MW gas request with a signed interconnection agreement in the ERCOT interconnection queue, in Ward County, Texas.
Queue statusConsented
- PlanningQueued Jul 2024 (completed)
- ConsentedOct 2025 (current stage)
- Construction (not yet reached)
- OperatingTarget May 2028 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 28INR0105
- Grid region
- ERCOT (Texas)
- Developer
- Permian Power I LLC
- Connection point (POI)
- Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2
- Location
- Ward County, Texas
- Technology
- Gas: 440 MW
- Total requested
- 440 MW
- Study phase
- SS Completed, FIS Started, IA
- Queue status
- Active
- Entered queue
- 22 July 2024
- Agreement signed
- 31 October 2025
- Proposed online date
- May 2028
Location
Marker shows the centre of Ward County; the queue data does not give exact sites.
Other requests in Ward County
- BasRanch (TEF - Due Diligence)Gas · 1,350 MW · agreement signed
- Vast Sands Power II (TEF-Due Diligence)Gas · 440 MW · agreement signed
- Staghorn GasGas · 10.0 MW · agreement signed
- Pyote GasGas · 9.9 MW · agreement signed
- Cedarvale GasGas · 9.9 MW · agreement signed
- New Minglewood Energy CenterBattery storage · 208 MW · in study
- BRP Rhine BESSBattery storage · 207 MW · in study
- BRP Pyxis BESSBattery storage · 207 MW · in study
- Frizzle BESSBattery storage · 181 MW · in study
- Proteus Thornton Ranch Solar SLFSolar + storage · 180 MW · in study
- Shallow Valley StorageBattery storage · 103 MW · in study
- FLIFER Solar ISolar · 84.0 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem