GAS · ERCOTStaghorn Gas
Staghorn Gas is a 10.0 MW gas request with a signed interconnection agreement in the ERCOT interconnection queue, in Ward County, Texas.
Queue statusConsented
- PlanningQueued May 2025 (completed)
- ConsentedMay 2025 (current stage)
- Construction (not yet reached)
- OperatingTarget May 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 26INR0698
- Grid region
- ERCOT (Texas)
- Developer
- RPC Merchant LLC
- Connection point (POI)
- STATION NAME: STAGHORN LOAD NAME: STGHRN_3 TNMP TRANSFORMER NAME: T3 BUS #: 37990 TRANSMISSION VOLTAGE: 138KV NODE: 9984
- Location
- Ward County, Texas
- Technology
- Gas: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- MRD Approved
- Queue status
- Active
- Entered queue
- 29 May 2025
- Agreement signed
- 30 May 2025
- Proposed online date
- May 2026
Location
Marker shows the centre of Ward County; the queue data does not give exact sites.
Other requests in Ward County
- BasRanch (TEF - Due Diligence)Gas · 1,350 MW · agreement signed
- Vast Sands Power II (TEF-Due Diligence)Gas · 440 MW · agreement signed
- Vast Sands Power I (TEF -Due Diligence)Gas · 440 MW · agreement signed
- Pyote GasGas · 9.9 MW · agreement signed
- Cedarvale GasGas · 9.9 MW · agreement signed
- New Minglewood Energy CenterBattery storage · 208 MW · in study
- BRP Rhine BESSBattery storage · 207 MW · in study
- BRP Pyxis BESSBattery storage · 207 MW · in study
- Frizzle BESSBattery storage · 181 MW · in study
- Proteus Thornton Ranch Solar SLFSolar + storage · 180 MW · in study
- Shallow Valley StorageBattery storage · 103 MW · in study
- FLIFER Solar ISolar · 84.0 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem