United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Barclay BrEl PV

Barclay BrEl PV is a 25.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0052
Grid region
ERCOT (Texas)
Developer
SoCore Energy
Connection point (POI)
tap 69kV 69 Barclay - 65 Silver City
Technology
Solar: 25.0 MW
Total requested
25.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 November 2016
Proposed online date
October 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem