OTHER Β· ERCOTSnyder BESS
Snyder BESS is a 17.6 MW other request withdrawn in the ERCOT interconnection queue, in Scurry County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedDec 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0258
- Grid region
- ERCOT (Texas)
- Developer
- Snyder Wind Farm, LLC
- Connection point (POI)
- 6658 Plainview 69kV
- Location
- Scurry County, Texas
- Technology
- Other: 17.6 MW
- Total requested
- 17.6 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 27 March 2019
- Proposed online date
- November 2021
- Withdrawn
- December 2021
Location
Marker shows the centre of Scurry County; the queue data does not give exact sites.
Other requests in Scurry County
- Canyon WindOnshore wind Β· 309 MW Β· agreement signed
- Coyote WindOnshore wind Β· 243 MW Β· agreement signed
- Maldives SolarSolar Β· 184 MW Β· agreement signed
- Knapp BESSBattery storage Β· 10.0 MW Β· agreement signed
- Spectra SolarSolar Β· 1,200 MW Β· in study
- Zeus Scurry BESSSolar + storage Β· 1,043 MW Β· in study
- Zeus Scurry SolarSolar + storage Β· 504 MW Β· in study
- Cedar Draw SolarSolar + storage Β· 451 MW Β· in study
- Inadale BESSSolar + storage Β· 287 MW Β· in study
- Inadale SolarSolar + storage Β· 281 MW Β· in study
- Cedar Draw BESSSolar + storage Β· 226 MW Β· in study
- Fluvanna Max Solar SLFSolar + storage Β· 153 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem