United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTKnapp BESS
Knapp BESS is a 10.0 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Scurry County, Texas.
Queue statusConsented
- PlanningQueued Mar 2025 (completed)
- ConsentedMar 2025 (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 25INR0747
- Grid region
- ERCOT (Texas)
- Developer
- Knapp ESS Assets, LLC
- Connection point (POI)
- Station Name: KNAPP Station Code: KNAPP Station Bus Number: #1310 Station Transmission Voltage: 138 kV Load/Load Transformer Name: LDLXFMR2 Distribution Voltage: 12.47 kV
- Location
- Scurry County, Texas
- Technology
- Battery: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- MRD Approved
- Queue status
- Active
- Entered queue
- 6 March 2025
- Agreement signed
- 13 March 2025
- Proposed online date
- December 2025
Location
Marker shows the centre of Scurry County; the queue data does not give exact sites.
Other requests in Scurry County
- Canyon WindOnshore wind · 309 MW · agreement signed
- Coyote WindOnshore wind · 243 MW · agreement signed
- Maldives SolarSolar · 184 MW · agreement signed
- Spectra SolarSolar · 1,200 MW · in study
- Zeus Scurry BESSSolar + storage · 1,043 MW · in study
- Zeus Scurry SolarSolar + storage · 504 MW · in study
- Cedar Draw SolarSolar + storage · 451 MW · in study
- Inadale BESSSolar + storage · 287 MW · in study
- Inadale SolarSolar + storage · 281 MW · in study
- Cedar Draw BESSSolar + storage · 226 MW · in study
- Fluvanna Max Solar SLFSolar + storage · 153 MW · in study
- Roost Energy StorageBattery storage · 102 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem