SOLAR Β· ERCOT

Bluebell 3

Bluebell 3 is a 15.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0285
Grid region
ERCOT (Texas)
Developer
Bluebell Solar
Connection point (POI)
Divide
Technology
Solar: 15.0 MW
Total requested
15.0 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
8 August 2019
Proposed online date
July 2020
Withdrawn
August 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem