RE Trent

RE Trent is a 20.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0018
Grid region
ERCOT (Texas)
Developer
Recurrent Energy
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
4 October 2011
Proposed online date
December 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem