United States › Grid › Interconnection queues › Texas

ONSHORE WIND · ERCOT

Baird North II Wind

Baird North II Wind is a 20.0 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Callahan County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. ConsentedOct 2020 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0498
Grid region
ERCOT (Texas)
Developer
BMP Wind LLC
Connection point (POI)
68008 Latimer 345kV
Location
Callahan County, Texas
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
30 April 2020
Agreement signed
15 October 2020
Proposed online date
July 2021
Withdrawn
March 2021

Location

Marker shows the centre of Callahan County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Callahan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem