United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTBaird North II Wind
Baird North II Wind is a 20.0 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Callahan County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- ConsentedOct 2020 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0498
- Grid region
- ERCOT (Texas)
- Developer
- BMP Wind LLC
- Connection point (POI)
- 68008 Latimer 345kV
- Location
- Callahan County, Texas
- Technology
- Wind: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 30 April 2020
- Agreement signed
- 15 October 2020
- Proposed online date
- July 2021
- Withdrawn
- March 2021
Location
Marker shows the centre of Callahan County; the queue data does not give exact sites.
Other requests in Callahan County
- Sequoia II SolarSolar · 418 MW · agreement signed
- Dorado SolarSolar · 401 MW · agreement signed
- Baird North WindOnshore wind · 340 MW · agreement signed
- Hittson Creek SolarSolar + storage · 403 MW · in study
- Hittson Creek BESSSolar + storage · 205 MW · in study
- Guitar BESSBattery storage · 205 MW · in study
- Sheep Creek WindOnshore wind · 153 MW · built
- Sheep Creek StorageOther · 142 MW · built
- Box Canyon Energy StorageOther · 306 MW · withdrawn
- Century Oak WindOnshore wind · 126 MW · withdrawn
- Kaiser Creek WindOnshore wind · 102 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem