ONSHORE WIND Β· ERCOT

Kaiser Creek Wind

Kaiser Creek Wind is a 102 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Callahan County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2016 (completed)
  2. Withdrawn / abandonedJun 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0042
Grid region
ERCOT (Texas)
Developer
Calpine
Connection point (POI)
Tap 138kV 6275 Abilene East β€šΓ„Γ¬ 6670 Putnam
Location
Callahan County, Texas
Technology
Wind: 102 MW
Total requested
102 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
11 October 2016
Proposed online date
November 2021
Withdrawn
June 2021

Location

Marker shows the centre of Callahan County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Callahan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem