United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· ERCOTKaiser Creek Wind
Kaiser Creek Wind is a 102 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Callahan County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedJun 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 18INR0042
- Grid region
- ERCOT (Texas)
- Developer
- Calpine
- Connection point (POI)
- Tap 138kV 6275 Abilene East βΓΓ¬ 6670 Putnam
- Location
- Callahan County, Texas
- Technology
- Wind: 102 MW
- Total requested
- 102 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 11 October 2016
- Proposed online date
- November 2021
- Withdrawn
- June 2021
Location
Marker shows the centre of Callahan County; the queue data does not give exact sites.
Other requests in Callahan County
- Sequoia II SolarSolar Β· 418 MW Β· agreement signed
- Dorado SolarSolar Β· 401 MW Β· agreement signed
- Baird North WindOnshore wind Β· 340 MW Β· agreement signed
- Hittson Creek SolarSolar + storage Β· 403 MW Β· in study
- Hittson Creek BESSSolar + storage Β· 205 MW Β· in study
- Guitar BESSBattery storage Β· 205 MW Β· in study
- Sheep Creek WindOnshore wind Β· 153 MW Β· built
- Sheep Creek StorageOther Β· 142 MW Β· built
- Box Canyon Energy StorageOther Β· 306 MW Β· withdrawn
- Century Oak WindOnshore wind Β· 126 MW Β· withdrawn
- Baird North II WindOnshore wind Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem