SOLAR Β· ERCOTPecos Solarpower II
Pecos Solarpower II is a 25.0 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2013 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 15INR0060
- Grid region
- ERCOT (Texas)
- Developer
- Duke Energy Renewables Solar, LLC
- Technology
- Solar: 25.0 MW
- Total requested
- 25.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 15 November 2013
- Proposed online date
- December 2015
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem