SOLAR Β· ERCOT

Pecos Solarpower II

Pecos Solarpower II is a 25.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
15INR0060
Grid region
ERCOT (Texas)
Developer
Duke Energy Renewables Solar, LLC
Technology
Solar: 25.0 MW
Total requested
25.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
15 November 2013
Proposed online date
December 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem