OTHER Β· ERCOT

Zier Storage Phase 2

Zier Storage Phase 2 is a 20.2 MW other request withdrawn in the ERCOT interconnection queue, in Kinney County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2021 (completed)
  2. Withdrawn / abandonedApr 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0544
Grid region
ERCOT (Texas)
Developer
Zier Solar, LLC
Connection point (POI)
78255 Pinto Creek 138kV
Location
Kinney County, Texas
Technology
Other: 20.2 MW
Total requested
20.2 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
30 May 2021
Proposed online date
August 2023
Withdrawn
April 2022

Location

Marker shows the centre of Kinney County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Kinney County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem