United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBrangus Solar
Brangus Solar is a 205 MW solar request withdrawn in the ERCOT interconnection queue, in Kinney County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2019 (completed)
- Withdrawn / abandonedJul 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0018
- Grid region
- ERCOT (Texas)
- Developer
- 245CK 8me LLC
- Connection point (POI)
- Tap 138 kV 8252 Bracketville - 8260 Escondido
- Location
- Kinney County, Texas
- Technology
- Solar: 205 MW
- Total requested
- 205 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 26 December 2019
- Proposed online date
- June 2023
- Withdrawn
- July 2020
Location
Marker shows the centre of Kinney County; the queue data does not give exact sites.
Other requests in Kinney County
- DeSpain Solar ProjectSolar Β· 236 MW Β· in study
- Longday Solar SLFSolar + storage Β· 201 MW Β· in study
- Cairos Storage 2Battery storage Β· 184 MW Β· in study
- Turkey Creek Solar SLFSolar + storage Β· 181 MW Β· in study
- Cairos SolarSolar + storage Β· 153 MW Β· in study
- Kinney County EnergyBattery storage Β· 101 MW Β· in study
- Las Moras BatteryBattery storage Β· 101 MW Β· in study
- Galvanic BESSBattery storage Β· 100 MW Β· in study
- Cairos StorageSolar + storage Β· 77.3 MW Β· in study
- Zier SolarSolar Β· 163 MW Β· built
- Zier StorageOther Β· 40.4 MW Β· built
- Brangus StorageOther Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem