United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

TG East 2

TG East 2 is a 10.0 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Knox County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2019 (completed)
  2. Withdrawn / abandonedDec 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0463
Grid region
ERCOT (Texas)
Developer
TG East Wind Project LLC
Connection point (POI)
60722 Coulomb 345kV
Location
Knox County, Texas
Technology
Wind: 10.0 MW
Total requested
10.0 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
26 November 2019
Proposed online date
December 2021
Withdrawn
December 2019

Location

Marker shows the centre of Knox County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Knox County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem