BATTERY STORAGE Β· ERCOT

Pueblo BESS

Pueblo BESS is a 9.9 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0581
Grid region
ERCOT (Texas)
Developer
SBESS TX 9 LLC
Connection point (POI)
Load: 9.9MW_x000D_ Load Name or Load Transformer name: 138_12_2_x000D_ PTI Bus #: 8273_x000D_ Transmission-level voltage (high side kV): 138
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
No MRD
Queue status
Withdrawn
Entered queue
14 June 2023
Proposed online date
October 2024

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem