United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTSand Bluff Repower
Sand Bluff Repower is a 8.0 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Glasscock County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2018 (completed)
- Withdrawn / abandonedJul 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0163
- Grid region
- ERCOT (Texas)
- Location
- Glasscock County, Texas
- Technology
- Wind: 8.0 MW
- Total requested
- 8.0 MW
- Queue status
- Withdrawn
- Entered queue
- 27 August 2018
- Withdrawn
- July 2019
Location
Marker shows the centre of Glasscock County; the queue data does not give exact sites.
Other requests in Glasscock County
- Gardner Draw SolarSolar · 300 MW · agreement signed
- Windjammer WindpowerOnshore wind · 293 MW · agreement signed
- Gusty WindpowerOnshore wind · 209 MW · agreement signed
- Champaign BESSBattery storage · 201 MW · agreement signed
- Honey Mesquite Wind FarmOnshore wind · 174 MW · agreement signed
- Harald (BearKat Wind B)Onshore wind · 162 MW · agreement signed
- Cannibal Draw SolarSolar + storage · 150 MW · agreement signed
- Forest Creek Wind RepowerOnshore wind · 125 MW · agreement signed
- Cannibal Draw StorageSolar + storage · 98.6 MW · agreement signed
- Proteus London-Leigh Solar SLFSolar + storage · 600 MW · in study
- Pleiades StorageBattery storage · 206 MW · in study
- Cummins BESSBattery storage · 201 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem