SOLAR + STORAGE · ERCOT

Proteus London-Leigh Solar SLF

Proteus London-Leigh Solar SLF is a 600 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Glasscock County, Texas.

Queue statusIn planning
  1. PlanningQueued Mar 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25INR0608
Grid region
ERCOT (Texas)
Developer
London Leigh Solar, LLC
Connection point (POI)
345kV Bernoulli (bus # 59907)
Location
Glasscock County, Texas
Technology
Solar: 600 MW · Battery
Total requested
600 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
22 March 2024
Proposed online date
September 2028

Location

Marker shows the centre of Glasscock County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Glasscock County